Skip to content

Government & Infrastructure Solutions

Industrial works of high impact.

We deliver where others cannot: high-standard critical infrastructure for the energy, oil and gas sector.

Engineering, procurement and construction.

We provide EPC services for the energy, oil and gas sector, specializing in storage tanks, fired heaters, steam reformers, pipelines and transport lines for various products, road rehabilitation and commercial buildings.

Companies
Kreis, Altaguarda and DTC
Project clients
PEMEX Exploración y Producción, PEMEX Transformación Industrial and Conagua
Projects on this page
4 in progress and 4 delivered
Sectors
Energy, oil and gas; water and sanitation; roads

Works in progress

In progressMurúa neighborhood, Tijuana, Baja California · Altaguarda

Rehabilitation of the Oriente Interceptor in the Murúa neighborhood, Tijuana, B.C.

Tijuana River sanitation · Wastewater

Rehabilitation of 1.6 km of the Oriente Interceptor wastewater collector, part of the Mexican Government's Tijuana River sanitation program, benefiting 112,000 residents.

Client
Conagua
Collector rehabilitated
1.6 km
Residents benefited
112,000
Program
Tijuana River sanitation

In progressPátzcuaro, Michoacán · Kreis

Rehabilitation and expansion of the San Pedrito wastewater treatment plant.

Civil engineering · Deep foundation

Deep foundation for the new infrastructure through 9 piles cast with the Tremie pipe technique: submerged pouring that displaces the bentonite slurry from the bottom up and allows water to be reused on site.

Foundation piles
9
Mix per pile
6.5 t
Steel per pile
21 m
Project total
~58.5 t · 189 m

In progressCoatzacoalcos, Veracruz · Altaguarda

Maintenance of the cryogenic system at the TASP Pajaritos terminal.

Rotating & static equipment · Cryogenic system

Corrective and preventive maintenance of the cryogenic system and auxiliary services at the Storage Terminal (TASP Pajaritos): vapor handling and transfer system of Liquefied Terminal I, reciprocating compressors, product transfer pump and heat exchanger.

Reciprocating compressors
BC-1000 / 1001
Air compressors
BC-2000 / 2001
Transfer pump
BA-3002
Heat exchanger
CH-1001

In progressMultiple PEP fronts · DTC

Rehabilitation of roads and bridges for PEP operational activity.

Civil works · Roads & bridges

Construction and/or rehabilitation of roads and bridges associated with the operational activity of Pemex Exploración y Producción (PEP). An active project across multiple fronts (Anta y Culico, Sunuapa, Gregorio Méndez, Reforma, Macayo, San Lorenzo, Refugio and more) ensuring safe access to operating facilities.

Main client
PEMEX PEP
Contract
640853836
Active fronts
Several
Work order
APLT-003-2024

Delivered works

DeliveredMinatitlán, Veracruz · Kreis

Rehabilitation of storage tanks at the Minatitlán Refinery.

Maintenance & rehabilitation · Refinery sector

Comprehensive maintenance and rehabilitation of storage tanks in Sector No. 4 of the Minatitlán Refinery, including the TV-507 and TV-6. Infrastructure projects carried out for Pemex Transformación Industrial (PEMEX TRI) under works contracts 5200011515 and 5200011123.

Rehabilitated tanks
TV-507 · TV-6
Main client
PEMEX TRI
Refinery area
Sector 4
Works contracts
2 contracts

DeliveredIguala, Añil y Pajaritos · Altaguarda

Rehabilitation campaign for strategic storage tanks.

Maintenance & rehabilitation · Storage systems

Comprehensive maintenance, repair and rehabilitation of storage tanks at the TAD Iguala, TAD Añil and TASP Pajaritos terminals, recovering over 400 MB of operating capacity for the safe handling of crude oil and gasoline.

Tanks serviced
5 tanks
Capacity recovered
+400 MB
Terminals serviced
TAD and TASP
Stored product
Hydrocarbons

DeliveredKreis, Altaguarda and DTC

Rehabilitation of fired heaters at Pemex refineries.

Maintenance & rehabilitation · Fired heaters

Rehabilitation of fired heaters at National System refineries: heater F-1802 of the HDG plant (Sector No. 2) and BA-401 of the U-400 plant, both at the Minatitlán Refinery, and heater BA-502 at the Tula Refinery, in Tula de Allende, Hidalgo.

Heater · HDG Sector 2
F-1802
Heater · U-400 plant
BA-401
Heater · Tula Refinery
BA-502
Main client
PEMEX TRI

DeliveredKreis, Altaguarda and DTC

Civil works and infrastructure for the energy sector.

Civil works · Industrial infrastructure

Civil works, steel structures and facility adaptation for terminals, plants and maritime fronts in the energy sector: shelters, booths and storage areas, foundations, maritime works and heavy equipment handling.

Facilities
Shelters & booths
Buildings & supports
Steel structure
Docks & piling
Maritime works
Oversized equipment
Heavy handling

Let's talk about your industrial project.

We put engineering, procurement and construction on your side. Tell us what you need to solve and our team will present the right solution.